
|
E D R C | Estero Design Review Committee December 10, 2002 4 pm 7 pm Estero Methodist Church | | Meeting Time: 4:10 pm 6:15 pm | Notes taken by: Debbie Lasich | | Attendees: | Gordon Lyons, Bill Prysi, Cynthia Caterham, Diane Ferrando, Wayne Robinson, Bob Flato, Ron Dillon, Al Oonnell | Meeting Minutes of 12/10/02 | | Applicant: Corkscrew Plams, LLC / $100 fee paid and received by W. Robinson / Form 8 B (Voting Conflict) filed by A. ODonnell and given to W. Robinson for file. | | Presentation by: Tom Lehnert Banks Engineering / Engineering Gary Krveger Shenkel- (?) | | Comments: | ·1 Drawing must be to scale (actual dimensions) | ·2 Applicant seeking deviation from 45 foot maximum building height requirement. Need plan to show final height. (LDC code) | ·3 Applicant to revise plans to show location of mechanical equipment (stated this will be located on the roof) | ·4 Applicant to submit all 4 elevations | ·5 Main entrance needs to be revised looks like a fire escape. Clarification of actual height.·6 Pedestrian linkages need to be revised suggest adding a sidewalk in the courtyard. Center is not very pedestrian friendly and no direct access to other buildings.·7 Landscape: Wax Myrtle is not a good buffer, Aztec Grass over 4,000 normal is 500, this is a weak plantMulch only 25% can be cypress, suggest pine bark No specifications on palm plantings Application states planters in courtyard area not listed on plan ·1 Irrigation: Plan is incomplete. 1 4·1 Schedule of Uses: comment on construction of an indoor kennel? | | | | Applicant: Eckerd at Stoneybrook / $100 fee paid and received by W. Robinson | | Presentation by: Charlie Grebs Hole Montes / Planning & Engineering Greg Race Sembler Company /Developer | | Comments: ·2 Landscape design must relate and/or blend with Miramar and
Stoneybrook·3 Buffer to be extended to mirror
Stoneybrook landscape·4 Betterment Plan informed by presenters being completed for the entire site·5 Green space has been added in the back that will meet the 15 foot requested·6 Irrigation still being work on going for water permit·7 Lighting to relate to other existing communities to benefit all·8 Dumpsters have been isolated and can not be viewed from Corkscrew, visible from Miramar·9 Bicycle racks is required in overlay recommended by EDRC to revise plans·10 Entry Ways pavers at entrances, possibly with a concrete underlay, hardest·11 Signage to be coordinated with area requested no pylon sign. EDRC would like to review a sign package.·12 Architecture Corkscrew Road elevation EDRC suggested for arches to have more delineation (scored/tiled).·13 Plan left and right sides are reversed | | | | Old Business: | ·1 EDRC Monthly Meetings to be held 2nd Tuesday of each month. Meeting start time has been changed to 4:30 p.m. ·2 EDRC to brainstorm and select sub-committee to draft checklist | | | | New Business: | ·1 A. ODonnell to draft the language for landscape plan·2 W. Robinson to draft the language for introduction letter for application·3 Meeting time has been changed Start time will be 4:30 p.m. instead of 4 p.m.·4 Consideration of new meeting place location. B. Prysi to contact the Elks Lodge (concern is time constraints)·5 W. Robinson to list time limitations by applicant on agenda | | | | NEXT MEETING DATE WILL BE JANUARY 14TH AT 4:30 PM AT ESTERO METHODIST CHURCH |
|
|